Case study: Compressed air for drilling and piling operations

GenAir compressor and equipment on site

Case Study 

Compressed air for drilling and piling operations

Drilling and piling operations on major infrastructure projects require reliable, high-capacity compressed air to power equipment and support efficient operations. 

For a drilling and piling contractor working on a large infrastructure project in the Midlands, GenAir provided a flexible temporary compressed air rental solution to support drilling equipment, piling rigs and hole cleaning.

 

Background 

The contractor was undertaking drilling and piling works as part of a major infrastructure project in the Midlands. 

With demanding site conditions and a requirement for continuous operation, the contractor needed a reliable temporary compressed air solution that could adapt as the project progressed. 

 

The challenge 

The contractor required a dependable compressed air supply capable of supporting continuous drilling and piling operations in challenging construction site conditions. 

The key requirements were: 

  • A reliable, high-capacity compressed air supply. 
  • Support for drilling equipment, piling rigs and hole cleaning. 
  • Continuous operation in challenging site conditions. 
  • Flexibility to adapt as the project progressed. 

 

The solution 

GenAir provided a specialist temporary compressed air rental package designed to meet the contractor’s drilling and piling requirements. 

The solution featured high-capacity air compressors in a modular configuration, allowing the equipment to be scaled and relocated as the project progressed. 

This flexible arrangement enabled the compressed air supply to adapt to the contractor’s changing requirements throughout the drilling and piling phase. 

Implementation 

GenAir provided a turnkey service, including delivery of the compressed air equipment and responsive technical support.

 

The result 

The temporary compressed air rental package delivered consistent performance throughout the drilling and piling phase, helping the contractor maintain productivity and minimise disruption. 

Key outcomes included: 

  • Reduced downtime: Reliable compressed air helped reduce interruptions to drilling and piling operations. 

  • Improved productivity: Consistent performance supported efficient operations throughout the project. 

  • Greater flexibility: The modular configuration allowed the equipment to be scaled and relocated as required. 

  • Cost-effective operation: The rental package provided an affordable compressed air solution for the project.

 

Customer feedback 

“Reliability and flexibility are key on large infrastructure projects. The compressed air solution delivered consistent performance, and the support allowed us to keep the project moving without disruption.” 

Operations Manager, Drilling & Piling Contractor

 

Conclusion 

By providing a reliable, high-capacity compressed air rental package, GenAir supported the contractor’s drilling and piling operations throughout a major infrastructure project in the Midlands. 

The modular configuration provided the flexibility required as the project progressed, while consistent performance and responsive technical support helped reduce downtime and improve productivity.